You don't have javascript enabled. Good luck with that.
Pencarian
 Terminal Kampung Rambutan Dipasangi 46 Lampu Sorot

46 Spotlights in Kampung Rambutan Terminal Installed

Around 46 spotlights type hight mass pole (HMP) are installed in Kampung Rambutan Terminal ahead of homecoming period.

Each spotlight has 480 watts power

Even repair on malfunctioned streetlights are also carried out to optimize lighting inside terminal.

Free Homecoming Program Registrant Reaches 16,400 People

"Each spotlight has 480 watts power," expressed East Jakarta Industry and Energy Sub-agency, Monday (5/27.

Those lights are precisely installed in the emplacement, front of the platform, bus lane, departure lane, and arrival lane.

Supervision and Control Section Head, Maryono explained that light repair and replacement is conducted at 67 points of terminal.

"Each light has 200 watts power with type LED," he stated.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye917 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye812 personAldi Geri Lumban Tobing
  3. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye644 personAldi Geri Lumban Tobing
  4. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye495 personAldi Geri Lumban Tobing
  5. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye487 personAldi Geri Lumban Tobing